The Process
Six steps. No shortcuts.
A disciplined sequence from the ground up — because what's under the surface decides how long it lasts.
- 1
Consultation
On-site assessment of grade, drainage, soil and your design intent.
- 2
Design & Quote
A clear, itemized proposal covering thickness, reinforcement, finish and schedule.
- 3
Excavation & Base
Removal, compacted granular base and forming to exact elevations.
- 4
Reinforcement
Rebar or wire mesh, dowels and expansion joints placed for long-term strength.
- 5
The Pour
Air-entrained, high-strength mix placed, screeded and finished by hand.
- 6
Cure & Seal
Controlled curing, saw-cut joints and sealing to protect against salt and moisture.
Calgary & Area